To test ideas developed over the weeks and get feedback, the
model was brought to the underpass on the day of the street party/ public
consultation. This allowed for the public to interact with with the model and
make recommendations. We chose to use a model because it was more interactive
(and readable) than architectural drawings.
There was some good engagement throughout the event and the
feedback was really good. We hope to have another consultation to discuss the
design that was generated by the public at the street party.
 |
Developing a new scheme from the initial ideas |
 |
Ideas developing on site |
 |
Ideas continue to develop |
 |
Meandering pathways with green banks |
No comments:
Post a Comment